亚洲伊人成视频在线观看|亚洲图色自拍偷拍|av主播在线播放|久久桃花视频在线|美女免费视频一区|色婷婷久久久久久久|老鸭窝在线永久地址二|日本最新三级片不卡精品|亚洲视频熟女国产|欧美午夜天堂影视

當(dāng)前位置: 東方風(fēng)力發(fā)電網(wǎng)>看資訊 >海外風(fēng)電 > MHI Vestas launches 9.5MW V164 turbine in London

MHI Vestas launches 9.5MW V164 turbine in London

2017-06-08 來(lái)源:windpower 瀏覽數(shù):1810

 

Inside the assembly hall were four ready nacelles with their full covers mounted, and several electrical modules to be fitted in-house inside the bottom tower sections. Each module incorprates an internal power supply unit at the upper floor. This is going downward followed by an in-house manufacturerd DC/AC inverter (the AC/DC rectifier is in the nacelle rear), 66kV or 33kV transformer, and switch gear at bottom level.

Blade manufacture

MHI Vestas' Nakskov blade-manufacturing plant in Denmark started operations in 2014 in a refurbished former Vestas V90 blade facility. Blades are also manufacturered at the company's Isle of Wight facility in the UK, except the final painting and leading edge protection application stages, which are conducted in Nakskov.

Blades are made at MHI Vestas' Isle of Wight plant in the UK and in Denmark

The straight 80-metre blades are of the structural-shell type, whereby carbon-fibre sections are incorporated in the upper and lower shells. A noticeable feature of the 35-tonne unit is the large-diameter root section extending into a slender aerofoil towards the blade tip. The blade root incorporates a novel patented bolts-inserts design enabling reducing wall thickness, close bolt interspacing with more bolts at the circumference for absorbing blade loads. The combination of large blade root diameter and other distinct features indicates ample potential for future blade enlargement, building on the current design, or a complete new development.

Senvion has announced it is working on a 10MW-plus turbine. But the V164-9.5MW’s specific power rating of 450Wm2 probably represents a final installed power "stretching" with the current 80-metre blades. The next logical step for MHI Vestas to propel the unit over 10MW will require a larger rotor.

Andersen would not be drawn on specific plans. "The platform has already proven to be well scalable and we will do whatever necessary in future to stay competitive and fully match any competitor challenge."


【延伸閱讀】

標(biāo)簽:

閱讀上文 >> “清潔能源·創(chuàng)新使命峰會(huì)”在北京隆重開(kāi)幕
閱讀下文 >> 國(guó)家能源局公布12個(gè)“2017年北方地區(qū)冬季清潔取暖試點(diǎn)城市”

版權(quán)與免責(zé)聲明:
凡注明稿件來(lái)源的內(nèi)容均為轉(zhuǎn)載稿或由企業(yè)用戶注冊(cè)發(fā)布,本網(wǎng)轉(zhuǎn)載出于傳遞更多信息的目的,如轉(zhuǎn)載稿涉及版權(quán)問(wèn)題,請(qǐng)作者聯(lián)系我們,同時(shí)對(duì)于用戶評(píng)論等信息,本網(wǎng)并不意味著贊同其觀點(diǎn)或證實(shí)其內(nèi)容的真實(shí)性;


本文地址:http://m.yy8811.cn/news/show.php?itemid=47934&page=4

轉(zhuǎn)載本站原創(chuàng)文章請(qǐng)注明來(lái)源:東方風(fēng)力發(fā)電網(wǎng)

按分類瀏覽

點(diǎn)擊排行

圖文推薦

推薦看資訊